DIGI logo
Plastics and packaging

Digital production control for moulding shops

Multi-cavity moulds, weight counted in tenths of a gram, frequent mould and raw material batch changes. Quality separately for every cavity, pieces counted from the moulding machine cycle and batch genealogy from granulate to pallet.

Injection moulding shop floor
Challenges

Sound familiar?

High volumes, multi-cavity moulds and tight weight tolerances. A small deviation multiplies by thousands of pieces per shift. On the left the problem, on the right what the system does with it.

One cavity spoils the result of the whole mould

In the average of ten cavities you cannot see the problem. You see it only when every measurement has a cavity number.

What DiGi doesSmart Control

You tick measurement per cavity in the control plan. The system guides the operator cavity by cavity, every result has a cavity number, and Cp and Cpk are calculated separately for each. You point to the guilty cavity by name.

The weight drifts quietly

After a heater replacement or a raw material batch change the weight slowly rises. Every measurement is still in tolerance, but the trend is not.

What DiGi doesSmart Control

Cup on the scale, button, result in the system. The I-MR control chart shows the trend and raises a Nelson rule alarm while measurements are still in tolerance. The quality manager gets an alert, not a reject.

The mould runs on part of its cavities

A blocked cavity is everyday life. If the system does not know about it, the piece count and performance are false.

What DiGi doesSmart Monitor

Smart Monitor knows the mould and the number of active cavities. One moulding machine cycle is as many pieces as cavities actually running, so OEE and the plan add up even with blocked cavities.

The mould changeover eats the shift

The plan says an hour, it takes two and a half. Without measurement nobody knows how many hours a month you give away over the assumption.

What DiGi doesSmart Monitor

A mould change has a start, an end and a plan on the timeline. The changeover report shows the hours over plan per month, broken down by mould, machine and shift.

A granulate and pigment batch change

The defect shows up a week later. You need to know which pallets were made from that delivery and which were not.

What DiGi doesSmart Trace

The delivery gets a batch number and a label, the operator scans it at the hopper. On a defect you open the pigment batch and see the moulding batches and pallets it went into. You hold only those.

The hourly inspection depends on memory

The operator runs several machines. An inspection nobody reminds them about simply does not happen.

What DiGi doesSmart Control

The system reminds about the inspection on the tablet every hour, every set number of pieces or after a changeover. In blocking mode production will not start without a first article inspection.

Example

One shift with DiGi

Moulding machine WT-05, cup KB-300, eight-cavity mould. Data from the demo company.

  1. 06:00

    Mould changeover

    Smart Monitor

    The operator starts the mould change. A changeover with a 60-minute plan appears on the machine timeline.

  2. 07:10

    First article inspection

    Smart Control

    The tablet requires an inspection after the changeover. Eight cavities on the scale, each OK. Only now is the "Start production" button active.

  3. 07:15

    Raw material scan at the hopper

    Smart Trace

    The operator scans the label of the granulate bag and the pigment. From this moment the moulding batch has recorded what it is made from.

  4. 10:00

    Hourly inspection

    Smart Control

    Cavity 6 weighs 8.71 g with a tolerance of 8.5 ±0.25 g. The result is in tolerance, but the control chart shows six rising points. An alert goes to the quality manager.

  5. 14:00

    Morning meeting

    Smart Monitor

    Moulding machine OEE for the day, the WT-05 changeover took 85 minutes instead of 60, a loss list ranked by recoverable hours. The report arrived by e-mail before the meeting.

Our solutions

Modules for this industry

Every module works on its own, and together they run on one operator tablet and one register of products and moulds.

DiGi Smart Control

Quality control

Quality control that understands multi-cavity moulds. The operator measures cavity by cavity, the scale and the caliper send the result at the press of a button, and process capability is calculated separately for every cavity.

Measurement per mould cavity

One option in the control plan. The system guides the operator through the cavities, and every result has the cavity number saved.

Weight straight from the scale

Cup on the scale, button on the scale, value in the system. No keyboard and no retyping, with an immediate verdict against the tolerance.

SPC and process capability

The control chart shows weight drift after a heater replacement or a raw material change while measurements are still in tolerance.

The system watches inspection deadlines

Every hour, every number of pieces or after a changeover. In blocking mode production will not start without a first article inspection.

DiGi Smart Control details
Cpk
Quality per cavity
Capability separately for every mould cavity
Scale and caliper
By cable or Bluetooth
Trend, not reject
An alert from the control chart before the first reject
Guided operator
Step by step, with a drawing and instructions

DiGi Smart Trace

Batch traceability

Granulate, pigment and cartons as batches with a supplier and a quality status. The system links them to moulding batches and shipping pallets, together with the consumed quantity.

From pallet to raw material

A customer reports a bad pallet? You open it and see the granulate and pigment batches, the machine, the operator and the quality inspection results.

From delivery to pallets

A bad pigment batch? The system shows all moulding batches and pallets it went into. You hold exactly as much as needed.

Delivery quarantine

A delivery with a doubtful incoming inspection result waits for the quality department's decision and does not go to a machine.

Planned: recycled content

We are planning a module where the recycled content share follows directly from the raw material batches consumed on the machine. If this matters to you, write to us.

DiGi Smart Trace details
Scan instead of numbers
A barcode label or an RFID tag
Batch
Batch genealogy
From granulate to pallet
Precise hold
Only pallets from the bad delivery
PDF for the customer
The batch tree with one button

DiGi Smart Monitor

Production efficiency

Pieces are counted from the moulding machine cycle signal: it reaches the system through a gateway, and the operator only describes the downtime reason. The system knows the mould, so the piece count adds up even with blocked cavities.

Pieces from the cycle and active cavities

One machine cycle is as many pieces as cavities actually running. Results stay true even when the mould runs on part of its cavities.

Mould changeovers

A mould change has a start, an end and a plan on the timeline. You see how many hours a month you give away over the assumed time.

Moulding machine utilisation

Every machine and its result live. You see whether the problem is no order, no material, no packaging or a breakdown.

Rate losses

A slower cycle and micro-stops are a loss nobody measures. The loss list ranks itself by recoverable hours.

DiGi Smart Monitor details
OEE
Live OEE
Availability, performance and quality of every machine
Downtime reasons
Recorded at the moment of the event, from one dictionary
Moulds and cavities
Counting consistent with active cavities
Changeovers
Plan versus actual
Standards and customers

What your customers and auditors require

The system does not "grant compliance". It provides the records the auditor and the customer want to see, with a date, an operator and a gauge.

ISO 9001, IATF 16949 (automotive suppliers)

A control plan per part, the history of every measurement, NCR, CAPA and 8D workflow, a gauge register with a calibration due date.

Food packaging (BRC Packaging, ISO 22000)

Raw material batches with a supplier and quarantine, genealogy from delivery to pallet, inspection results attached to the batch.

Customer requirements

A Cp and Cpk capability report per characteristic and cavity, measurement history and the batch tree to PDF on a single request.

PPWR and recycled content

Planned: recycled content calculated from the raw material batches consumed on the machine. If this matters to you, write to us.

Questions

Questions we hear in this industry

Yours is not here? Write or call, we reply within 24 hours.

Manufacturers that work with us

PLP
Best Autotech
Aluprof
Teksid
DensoElectrolux

Let's talk about your production

We reply within 24 hours

Piotr Piorunkiewicz
Piotr Piorunkiewicz
Quality control expert

Piotr will help you pick the solution that fits your production processes.

The data controller is DevsPower. Privacy policy