DIGI logo
DiGi Smart Control

Quality control

The caliper reading goes straight into the system. The verdict is immediate.

DiGi Smart Control replaces paper inspection cards. The technologist defines the plan, the system watches the inspection moment, the operator measures with a connected gauge, and the quality manager sees process capability before the first reject.

Price: from 999 PLN per monthSee pricing

Quality control operator screen: list of characteristics, drawing with a highlighted balloon and the measurement field
How it works

How does DiGi Smart Control work?

From the inspection reminder, through a reading from the scale, to an alert at the quality manager. Click a step or wait, the animation advances automatically.

DiGi Smart Controllive data124measurementsShift 3Shift 1ProductionChangeoverDowntimeC-MASA8,5 ±0,25 gIn toleranceOut of toleranceLast measurementDefect: weight out of tol.Cause: melt temp.Operator: John K.RAW MATERIALMACHINE · M-01PALLETSS-PP-0412B-0093W-2291W-2292W-2293PAL-0553PAL-0554Links are created at the scan. The tree works both ways.HOLD: 2 palletsM-01 · MACHINEPLCOPERATORTABLETRAW MATERIAL0.008.52 gINSPECTION STATIONPAL-0553PRODUCT PALLETM-01OEE 65%QUALITY · M-01WEIGHTAVGNOK 0BATCHES · M-01INPUTS-PP-0412OUTPUTW-2292COMPLIANTSHOP FLOOR TV65%OEEDowntime ParetoShift 1Capability (Cpk)C-MASAC-SRD-GC-WYSC-WYGLPart weight · Cpk 0.97NOK · weight · melt temp.Batches · todayS-PP-0412received 06:12W-2292machine · M-01PAL-0553pallet · 12 pcs15 batches active · 0 holdsComplaint: PAL-0553What was it made from?PAL-0553W-2291W-2292S-PP-0412B-0093M-01 · shift 1 · John K. · QC: OKBad delivery: B-0093Where did it go?B-0093W-2291W-2292W-2293PAL-0553PAL-0554HOLD 2 pallets · 0 shippedOut of tolerance — weightDowntime — M-01QUALITY MANAGERSHOP FLOOR1The system reminds about an inspectionAn hour has passed. An inspection to performappears on the operator's tablet.

Manufacturers that work with us

PLP
Best Autotech
Aluprof
Teksid
DensoElectrolux

Does this sound familiar?

Results retyped from paper

The operator measures, writes on paper, and somebody types it into a spreadsheet in the evening. Retyping errors and data a day late.

Inspection depends on who remembered

First piece after a changeover, an inspection every hour, every thousand pieces. On paper nobody can check whether it really happened.

The problem shows up only in a complaint

The process slowly drifts out of tolerance, and one mould cavity spoils the result. In aggregate numbers you cannot see it.

Step by step

What it looks like in practice

Six steps from the part drawing to a closed non-conformance, on system screens.

1Definition

A control plan for a new part ready in a quarter of an hour

You upload the drawing, the system recognises dimensions and tolerances, numbers them with balloons and proposes a list of characteristics. The technologist approves instead of retyping.

Launching a product stops being the quality department's bottleneck.

List of dimensions and tolerances recognised from a technical drawing
2Enforcement

The system watches inspection deadlines

You set when the inspection should appear: after order start, after a changeover, every hour or every thousand pieces. In blocking mode production will not start without a first article inspection.

Performing the inspection stops depending on who happened to remember.

Inspection trigger editor: event, quantity, time
3Measurement

The result comes straight from the gauge

The scale and the caliper connect to the tablet by cable or Bluetooth, straight in the browser. The operator presses the button on the gauge, the value enters the field and is judged against the tolerance right away.

The measurement takes as long as the measurement itself. No retyping errors.

OK or NOK verdict on the operator screen
4Measurement

Out of tolerance: defect and cause right away

The red field opens non-conformance registration. The operator picks a defect and a cause from a dictionary. Taps, no typing.

You get a statistic of causes, not just a list of rejected results.

Non-conformance dialog with defect and cause selection
5Capability

The process drifts and you see it before the first reject

I-MR and X-bar/R control charts with trend detection rules, histogram, Cp and Cpk. Capability also calculated separately for every mould cavity and every machine.

You react to the trend, not to the complaint.

I-MR control chart with control limits and rule signals
6Response

The non-conformance gets closed, not just discussed

A decision on the non-conforming product, corrective actions with an owner and a deadline, an 8D report step by step, layered audits with an action list.

A closed loop: non-conformance, action, proof of completion.

8D report run in the system step by step
What sets it apart

What sets DiGi Smart Control apart

Drawing ballooning, measurement per cavity, instructions at every characteristic for the operator and capability you can trust.

Drawing ballooning

Upload the drawing, see the control plan

The system reads the PDF drawing, finds dimensions with tolerances and numbers them with balloons. The technologist checks and approves instead of retyping dimension by dimension. Recognised dimensions go into the control plan as characteristics with a tolerance, a gauge and a procedure, and the operator sees the same drawing during measurement.

Want to see it on your own drawing? Bring it to the demo and we will build the control plan live.

Drawing with balloons, each balloon is one characteristic in the control plan

Multi-cavity moulds

One cavity out of ten spoils the result. You cannot see it in the average.

The weight looks "conditionally capable" as a whole. Broken down by cavity, nine are green and one is red. Without measurement per cavity you would only know that something is wrong with the weight.

You tick one option in the control plan. The operator is guided cavity by cavity, and every result has the cavity number saved.

Selecting mould cavities for measurement on the operator screen

Instructions at the operator

The operator knows exactly what to measure and with what

For every characteristic the operator sees the drawing with a highlighted balloon, a photo or a video with instructions from the technologist, and the gauge name. They do not have to remember where this dimension is on the part or how to measure it.

The order is set in advance too: the system leads characteristic by characteristic, cavity by cavity, in four interface languages.

Operator screen with the part drawing and the highlighted balloon of the measured characteristic

Capability done properly

A control chart that says what is happening, not just that something is

Nelson rules name the trend: nine points on one side, six rising, two out of three beyond 2σ. The system checks the normality of the distribution and warns when Cp and Cpk may be unreliable, instead of showing a pretty number.

Cp and Cpk next to Pp and Ppk, rolling windows of 15, 30 and 50 measurements, capability separately for every machine and cavity.

I-MR control chart, Nelson rules and a histogram with the normal distribution

What else is in the system

A characteristic described once, used everywhere

A characteristic catalogue shared by products. You override the nominal and tolerance in the plan of a specific part, without copying the characteristic.

The whole inspection sheet, not just dimensions

Dimensions with tolerance, visual checks, go/no-go gauges, defect counts, rating scales, characteristics calculated from a formula, multi-point measurement.

Measurement per mould cavity

The operator measures every cavity separately, and the result is assigned to the cavity. You point to the guilty cavity by name.

Drawing and instructions at the operator

The operator sees on the drawing which dimension they are measuring, plus a photo or a video with instructions added by the technologist.

Gauge register

Every measurement records which gauge it was taken with. The auditor's question "what was this measured with" is answered by the system.

Procedures: FAI, process control, critical characteristics

The same characteristic can appear in different procedures. At start the operator sees only what needs measuring at start.

Quality on the shop floor screen

A TV board with inspection results visible to the whole production, not only to the quality department.

Capability reports and measurement history

Cp and Cpk reports with export to PDF and spreadsheet, the full history of every session: who, when, with what, on which cavity.

Four interface languages

Polish, English, Ukrainian and Spanish. Data quality does not depend on who is on the shift.

Who it is for

Everyone sees what they need

Pick your role.

  • Where is the problem? The capability board: every characteristic with a colour, Cp and Cpk, machine and cavity ranking.
  • Did the inspection really happen? The system watches the inspection moment and counts done versus planned.
  • Will we react in time? A signal from the control chart before the first reject.
  • What do I show at the management review and to the customer? Capability reports and a defect Pareto in one click.
  • Was the non-conformance closed? An NCR with a disposition, actions with an owner and a deadline, proof of completion.
Process capability board with green, yellow and red colours
Implementation

Four steps, without stopping production

We start with one product and one inspection station, with your gauge and your drawing.

  1. Step 1

    Choosing the product and the station

    One part with a drawing, one inspection station, the gauges you measure with today. One meeting, usually online.

  2. Step 2

    Pilot on one station

    The control plan in the system, a scale or a caliper connected to the tablet. The operator measures in the system alongside the paper card.

  3. Step 3

    Adjustments on results

    After two or three weeks we review the measurements: tolerances, defect and cause dictionaries, inspection moments.

  4. Step 4

    More products and the quality department

    More parts and stations join, control charts and the capability board for the quality department, the non-conformance and action workflow.

Start with a pilot on one workstation

One product, one workstation, real data. After the pilot you decide whether and how fast we go further.

Ask about a pilot
FAQ

Common questions

See quality control on your own part

We reply within 24 hours

Piotr Piorunkiewicz
Piotr Piorunkiewicz
Quality control expert

Piotr will help you pick the solution that fits your production processes.

The data controller is DevsPower. Privacy policy